Friday, February 26, 2016

Penpals?




A recent letter to the editor has prompted a terse reply from Coldstream's Gyula Kiss, who sets the record straight!

The above letter was published in the Morning Star on February 21, 2016. The following is my response to that letter.

"Nice to see that someone appreciates my efforts of trying to make sense of the MWP! Unfortunately, I cannot take all the credit for the defeat of the referendum last November. The writer may remember that there were two members of GVAC who voted against both the MWP and taking it to referendum. The rest of the GVAC members supported the plan and sent it to public scrutiny. Staff and consultants put forward their best efforts to convince the public to vote “yes”.

During the election campaign something changed. Most of the candidates running for office declared that they no longer supported the referendum and they would vote against it. Why did these candidates change their minds? Did they receive additional information on the plan? If they could share this new information with the members of SAC it would make their work a lot easier." 

The only two sitting Directors on GVAC who remained supporters of the referendum were those who were acclaimed without having to campaign. Oddly, those are the only two Directors who are NOT customers of the GVWU and do not pay for the MWP.

You mention using cash-basis to cover the costs of the MWP budget. That is exactly what staff had been doing since the 2004 referendum. Ratepayers approved the borrowing of $35 M for the MWP yet we spent over $66 M by 2012. Where did the extra cash come from? It came from direct cash extraction from ratepayers. This was against the spirit of the referendum as this cash is not shared by future ratepayers. If staff needed $66 M they should have asked for a loan approval of $66 M not $35 M.

The DCWTP was not recommended by the Consultants of MWP 2002. In fact, they declared the current plan a waste of money. Which consultants were right? Judging from the results the 2002 consultants were right.

Adding a filtration plant to Duteau was not mentioned in the 2004 MWP Addendum. That was kept a secret for fear of rejection of such large referendum bill.

The cost of borrowing $35 M is about $2.4 M annually. This represents about 12% of the total budget of $19.6 M. Feet dragging is not the cause of the high bills: the cause is the high cost of operation and maintenance of the triple  water system. We now operate the Kalamalka Lake system, the old VID system with the domestic quality irrigation water and the new raw water irrigation system built by the ratepayers of GVWU. Those are the sources of the high water cost. Ad to this the cost of the two filtration plants in the plans along with their operation costs and you’ll see where we are heading with water rates.

One would hope these high water costs are shared equally by all customers. Not a chance! The majority of RDNO Directors just approved the rates for 2016. Domestic customers will continue to subsidize ICI customers for over $2.5 M for 2016. If subsidies are necessary than the entire community should contribute through a RDNO Function. As it is only domestic water customers participate in this subsidy. The two Directors who fought hard for this subsidy are not participating in the costs. Easy to tell others to pay if you do not have to do the paying yourself!

So these are just some of the facts. There are lot more but let’s leave those for another occasion.

Writing a letter to the editor is easy. Writing a factual letter is a whole lot more difficult.
Some of you may wonder how the $2.5 M subsidy above was arrived at. Here is a quick summary:

Budget requirement for 2016:     $19,600,000
Agriculture contribution:              $     783,799
Needed from domestic:              $18,712,520
Expected water sales:                   5,820,000 m3
Cost of 1 m3 of water:                  $3.22
Water consumption ICI                   1,580,000 m3
Expected revenue    @ $3.22      $  5,080,000
Subsidized revenue @ $1.58       $  2,496,400
Difference (subsidy)                 $  2,583,631

These are real, hard figures calculated from the data provided by staff. We can manipulated anyway we wish but the real facts are these. Anyone who gets his/her water for less than $3.22 per m3 is being subsidized. The base fee of $408/a in real term is the value of 126.71 m3 of water. In other words we pay for 126.71 m3 of water without getting a drop.

Only (residential) water customers are forced to subsidize ICI customers.

The annual repayment of borrowing costs us 898,470 cubic meters of water. Every item in the budget can be expressed in terms of unit cost of water ($3.22 per m3). Employees' wages: every $10,000 costs 3,106 m3. Thus, if we subsidize anyone we force the rest of the customers to pay more than their fair share of those costs.

Mr. Kiss is absolutely correct!  
Kia offers a suggestion for letter writers:


 


Saturday, January 16, 2016

Annual Water Costs


The numbers are done, including comparisons.

This property has 3 water meters:  Residence, Clubhouse and Golf course irrigation.  Average annual costs for each cubic metre of water have been included, as well as percentage of allocation used.





Weird ... but cost per cubic metre clubhouse numbers for 2015 vs 2014 were double-checked.

Nominated for the category of "Who Pays More Towards the Ag Water Subsidy?" are:
  • Domestic Users
  • Commercial Users

"And the Oscar goes to...Commercial," says Kia.



The hands down winner is Commercial.
Yes, of course, base rates were included!
Because base rates are charged on water invoices too, not just consumption!


Monday, January 4, 2016

Loading the Bases


...the water base rate, that is.

While doing our family's year end paperwork, a couple of figures jumped out.

The residential base rate for GVW water for the 1st Q of 2014 was $80.50
The residential base rate for GVW water for the 1st Q of 2015 was $99.80
The residential base rate for GVW water for the 2nd Q of 2015 was $101.80 (water rate increases were effective April 1st...but as of 2016, increases are effective January 1st!)

Because they can.
How nice for Greater Vernon Water.


That's a  26.45962732919254  per cent increase in base rates in 15 months!



Simple...if you're Greater Vernon Water


"They're kicking themselves they didn't think of the standard calendar year a long time ago," offers Kia.

...and to think I'm sitting here waiting for the year end water consumption invoices to arrive (so I can finish my paperwork).
I don't think I want to see them.

Wednesday, December 30, 2015

Hydro Vying for Gouger of the Year with GVW


...and then raises the gouging ante.

Anything to do with a bureaucracy seems to be going absolutely mad with their charges to customers.

Just noticed the residential hydro bill crept -- albeit by only 76 kWh -- into the Step 2 rate for the period October 22nd through December 18th, 2015. 

Step 1 was 1,287 kWh, charged at $.07970...8 cents / kWh.

Step 2 is charged at $.11950...12 cents / kWh.

"W.A.C. Bennett just turned over in his grave," offers Kia.

Ringing in my ears is WAC's comment "owned by the residents of British Columbia".


Oh...and a pantload of thanks to Coldstream Municipality's leaders over the years with all their fooh-faah Official Community Plans, none of which were worth the powder to blow to hell.
Why? 
Because their interference with natural growth patterns stymied increases to Buchanan Road's density.

Did officials know their actions would equate to no natural gas being available here? 
In 40 years?
Nope.
 
 

Monday, December 14, 2015

Waters' Poor Relatives?


...yet according to the Okanagan Basin Water Board's motto, Kelowna and Armstrong might as well be in another province.

Source:  Okanagan Basin Water Board website

One valley, yes.
One water, supposedly.

If it's one valley and one water, the problem must be too many bureaucrats.
Bureaucrats who may have erred in choosing Duteau Creek as a water source.

All signs point to that as the Stakeholders Advisory Committee deliberates TM 9 (System Separation Option Analysis) this Thursday at RDNO's 8 a.m. meeting.

Open to the public.
Hint hint!

After having heard that Armstrong's water "mock" billing period has ended, and their rates published, it seems most folks pay about $65 to $85 annually for their residential water!

Thirty-one cents a cubic metre for water in Armstrong!

Then, we hear about a Kelowna resident on a city lot, two adults.
Covered was the annual period ending October 9, 2015.
Consumption?  390 cubic metres (so they must've had a wonderfully productive vegetable garden for their family and friends...good for them!)
Total bill, including sewer was $421.62!

My annual residential water bill?  At less than half the Kelowna example, my household of two adults used 155 cubic metres of water.  No veggie garden to speak of.
Total bill 2014, no sewer was $534.00.



"No wonder the North Okanagan is the poor relative of Kelowna and Armstrong," intones Kia.

Our wallets?
Full o' cobwebs...

Wednesday, December 9, 2015

You Don't Believe What Agriculture Pays for Water?


...for GVW's chlorinated--and soon to be filtered--water?

To put it simply, the more they use (without going over their allocation), the cheaper their per cubic metre cost is.

Yup.

First, the rules:
Agricultural allocation under the 2015 Water Rates Bylaw 2672 here, is described as:


Allocation means the amount of water assigned to a property by the RDNO for irrigation purposes. The allocation is measured in hectares, and determines the maximum instantaneous flow rate permitted to the property, and the maximum total volume of water permitted per irrigation season.
1 acre of water = 0.404686 hectare

Agriculture pays $66.86/Q, per hectare of the property's allocation (click graphic to zoom):



Yes, agriculture is metered, but only for the purpose of ascertaining if/when a farm property's allocation is exceeded during the ~5 month annual irrigation season.  Tiered over-consumption rates then kick in as follows: 



There are no other agricultural water fees.

We'll do two examples where, for ease of comparison, each farm has 10.0035 acres allocation.

Farm A:
10.0035 acres allocation = 22,275 m3 allowable annual use.
If Farm A uses 22,000 m3, the Q allocation fee $66.84 x 4Q is $267.44 x 4.05 ha = $1,083.13.
$1,083.13 / 22,000 = 2,674.00 / 22,000 = $0.049 / m3

But, say it's a wet year:
If Farm A uses 11,000 m3, the Q allocation fee $66.84 x 4Q is $267.44 x 4.05 ha =$1,083.13.
$1,083.13 / 11,000 = $0.098 / m3


$1,083.13 is Farm A's total annual water bill, whether they use 22,275 m3 or 11,000 m3.
Period.
No base fee, no consumption charge because they didn't go over allocation.

Is it any wonder that Zee Marcolin, GVW Manager, said this at the December 3rd, 2015 SAC meeting when discussing Water Conservation:
"There's no hit to our revenue when ag conserves."
Zee Marcolin, GVW Manager

Farm B:
But it's a very dry year, and Farm B goes over allocation by 2,004 m3:

10.0035 acres allocation = 22,275 m3 + 2,004 = 24,279 m3

Farm B uses 24,279 m3, the Q allocation fee is $66.84 x 4Q is $267.44 x 4.05 ha = $1,083.13.
Plus Tier A (under 10% over-allocation) = 2,004 m3 x $.30/m3 = $601.20.  Grand Total $1,684.33
$1,684.33 / 24,279 = $$3,275.00 / 24,279 = $0.069 / m3

Result:  Farm A, in a wet year, uses 11,000 m3 water = $0.098 / m3
whereas in a full-use allocation year 22,000 m3 water = $ 0.049 / m3

Result:  Farm B, using 2,004 m3 over allocation, cost per cubic meter = $0.049

Source:  Agriculture rates are on page 9 of Bylaw link (above).

Then...something peculiar occurs that only Greater Vernon Water officials can explain (because it's nowhere on the rate sheet).

Both Farm A and Farm B would be eligible for rebates for domestic use (540 properties receive $269 per year and 650 properties receive $106.88 annually), further decreasing their m3 cost).


As the Stakeholder Advisory Committee deliberates, have they heard this compelling quotation by a member of the area's pioneer farming family:


“The untreated pressurized agricultural water system
put in place some 40 years ago still meets
the industry’s present and future needs.”
      Jamie Kidston, (Coldstream Corner “Agricultural Water Rates” July 17, 2015.)


Back to consumption examples.
Why was the odd amount 10.0035 acres (4.05 ha) allocation used for the example?
Because that's the water allocation for Highlands' Golf (non-farm) irrigation.

Let's look at only the 2014 Highlands Golf irrigation costs:  


2014 irrigation cost = $1.05 / m3 (despite what it says below....)
(plus clubhouse meter plus residence meter)


Consumption as a percentage of Highlands Golf allocation is shown below:



Within 3 years, the non-potable commercial irrigation category is being cancelled by GVW, at which time six commercial irrigators will be at a much higher rate for irrigation.

Whether or not you're a golfer, whether or not you agree that there's little difference between farm and golf course irrigation, you may agree that GVW's irrigation rates are beyond incomparable with farm irrigation rates.






"Gored and impaled," attests Kia.

Saturday, October 10, 2015

Castanet Omits the $1.2 million GVW Revenue Surplus


...imagine a public utility gaining $1.2 million more than had been projected...AFTER a requested 10 per cent reduction in water consumption!
But nobody even mentions it.


Here's Castanet's story, posted October 9th, 2015, by Kate Bouey (story 149391)

"Turning Off the Taps:
Greater Vernon water users heeded the call this past summer when asked to reduce water consumption.
Figures from the North Okanagan Regional District show a dramatic drop in water usage in early July, coinciding with a request to turn off those taps.
Daily demand for water in the first part of July (1-9) averaged 129 megalitres per day.
The regional district imposed Stage 1 water restrictions July 7.
Water usage dropped almost immediately.
Between July 10 and Aug. 12, water use fell to 102 megalitres per day, a 21 per cent drop.
The August average was 91 megalitres per day, eight per cent lower than in 2014.
District staff point to droughts in California and in Vancouver this summer, as well as at home, that may have contributed to the public effort to conserve.
It may also have to do with water bills. North Okanagan residents pay the highest water rates of the valley's three major cities.
The more water used by a household in Greater Vernon, the higher the price.
“The tiered rate has been effective in reducing excessive outdoor watering and for water conservation,” reads a district report."

Four comments were received from the public by Castanet on the story:

Funny that I'm driving home on this October morning and see sprinklers operating on city land on the same day it rained. They need to check themselves before telling others how to use the water.

"The tiered rate has been effective in reducing excessive outdoor watering and for water conservation,” reads a district report"
It has also been effective in preventing a family with 5 kids from playing in the sprinkler in the backyard, or having a garden to grow your own vegetables to try to reduce the sky-rocketing grocery bills, or even having grass soft enough to play in bare feet outside.
Congratulations to those responsible for our massive water plan failure that results in us paying more than double the cities nearby... "Rural living at its best" What an absolute embarrassment.

Exactly

ALSO……GOOD LUCK when you come looking (next referendum) for more funding !


"Yup, we North Okanaganers pay the highest water rates of the valley's three major cities," avows Kia, "even when we use less and less water."

 
And politicians will soon be scratching their heads wondering why fewer people than expected are moving to Vernon and Coldstream.

They should scratch hard.
Very hard.


Friday, October 9, 2015

GVAC Chair Cunningham "Nails" It


Albeit inadvertently.

At today's GVAC meeting, director Kiss asked the Chair why--in the draft minutes of the last meeting in today's Agenda prior to being Adopted--the $1.2 million Greater Vernon Water "overage", reported by Regional District CFO Banmen for the last quarter, was neither included nor referred to in detail.

No print record.

Reported by Banmen verbally.

The unadopted minutes of the September 3rd GVAC meeting stated: 

"Greater Vernon Water Revenue:
General Manager, Finance provided a verbal update regarding Greater Vernon water revenue, specifically regarding the impact of water restrictions".

Director Kiss suggested that the $1.2 million represented approximately 5 to 10 per cent more revenue than what the water utility had anticipated for the quarter -- considering that imposing Stage 1 water restrictions would lead to residents and farms reducing water using by ~10 per cent. 

Today, Mr. Banmen nodded at the reference to 5 to 10 per cent more revenue.

Likely more than one meeting attendee thought it odd--especially in the public gallery, let alone the media--that Banmen's had been a verbal report, especially considering that a provision for Late Items exists, even for the day of the meeting!

Unless of course, GVW doesn't want to appear to be a profit center...making a profit from providing water.
Versus serving the public (as a not-for-profit government utility.)

But today, Chair Cunningham responded: "Because the minutes aren't verbatim".


(Yet revenue shortfalls are often listed "to the penny".  Same with operating cost shortfalls.)

But non-verbatim minutes are THE problem!
Look at any past GVAC advisory committee minutes.  Unless you were present, can you discover specific suggestions and items proposed for inclusion or adoption, but not approved by the majority?
Do those ideas just go and die an anonymous death?
Yes they do, despite many having considerable merit for further thought "outside the box".

It was after the next item--the request by Citizens for Changes to the Master Water Plan to hire "an individual with an arm's length relationship to the existing plan, to assist the (SAC) committee by providing GVAC with independent advice--that Director Garlick proved that to be the case.

A director stated that the SAC committee's review of technical memoranda (summarized by GVW) is going over the same material that formed the master water plan, and that it's not an independent review.
Because it goes over the same package that was debated previosly.  And it was the same package whose borrowing referendum was defeated by residents.  Director Kiss added "there's no mention of a 2002 or 2004 water plan.  (The SAC) people should know more about it."  Other examples of what SAC could be considering were presented, but that they would only re-hash the existing plan's details, nothing new.

Garlick asked, perhaps rhetorically:  "What would be the process to actually start looking at something like this?"  RDNO boss Sewell replied, in part: "I'm not entirely clear...there are technical and political components.  We need to be very clear what we are reviewing."

Apparently a request for a proposal of a review would be typical.

Garlick responded:  What type of person do we know to help us? 
Sewell responded that he was leery of reviewing a political decision. 

Kiss continued, referring to the Summary of TM1, stating that water usage numbers from 2009 and 2011 had never been updated and that the SAC group doesn't know that the statistics for water demand for the next 40 years were a guess.  But that "We have four years of parameters now."  


About then, Coldstream Mayor Garlick--obviously newly comfortable with his chairing from the inaugural meeting of the SAC committee--usurped the Chair's authority and basically took over the meeting.  He stated "Bring them up at the committee," despite knowing that director Kiss's application for membership on the committee had been overlooked during the selection process.  Director Garlick has obviously forgotten that he had been quoted in the newspaper recently as saying "we don't want people there just to snipe."  He was presuming that director Kiss' educated and knowledgeable and scientific dissection of the master water plan--and sharing that information--was sniping.  No matter, SAC seems to have discovered its own sniper in the person of a residential volunteer.

So when Garlick states "Bring them (suggestions/ideas) up at the committee", he surely must realize there's no avenue to bring it up...no provision for the public to address or contact the SAC committee directly with suggestions.  The terms of reference for the committee are mute on that.  And Garlick knows it, wanting the committee to finish their deliberations in March; after which, "if they feel that an independent review is necessary, they will recommend it to GVAC."  But "it's the cost"...after which it was suggested that existing consultants being brought back to speak to SAC are costing money too. 

Garlick continued:  "Ask the questions.  Submit a request that we have additional data.  We need to know that we are getting information."

As to a consultant, Directors Spiers suggested that Coldstream and Vernon have technical engineering resources for the committee.    And where would money come from for an independent consultant?  And how much should be put aside?  The number $80,000 was suggested, and Banmen stated "it could come from reserves".

Director Kiss reminded directors that the plan must be sold with another referendum and that $80,000 is not expensive (considering what has already been spent).

Engineering GM McTaggart stated that TM9 will be gone over some time in January, and that it was the "real meat" of the plan.  That would be the time to determine what aspects should be reviewed, he concluded.

Garlick concluded the discussion with "Let me and Cunningham know what should be added to SAC."

This was followed by a motion that Coldstream and Vernon Engineering staff be included in SAC.

As to the "non verbatim" issue that started this blog story, allow me to provide what this meeting's Adopted Minutes will say about it:  "Discussion ensued on the merits of providing the SAC committee with additional information from Coldstream and Vernon engineering staff."  

Is it any wonder good ideas languish, then die anonymous death?



Thoughts on other agenda items today, beginning with the annual Review of Water Rates and Fees Structure proposed by GVW staff:

After creating the current complex rate structure, bureaucrats now seek to reduce its complexity from this current 13 page format (whose "meat", to use the McTaggart term, begins on page 9).  Citing "rate confusion, conservation concerns, fewer tiers in domestic rates (some communities have only 3 tiers), and errors and inconsistencies in administration complexity" bureaucrats are undertaking gutting their own document in its entirety and starting again.

Suspicious eyebrows shot up here and there in the public gallery, and one whispered comment passed between two seats:  "They must be running out of paperwork."

Personally, I'm reminded of a time when this also occurred.  For example, years ago rate sheets used to include the dollar amount charge from the water utility to Fire Departments in each community per public hydrant.  Then years later when I became aghast at being charged $470 and then $560 for two years of "Private unmetered fire hydrant fee", I was dismayed to NOT find that section on the rate sheet that detailed what fire departments were charged for each public hydrant.  So, folks, what will suddenly be lost in a rehashing of these rate sheet classifications/descriptions?  Don't laugh.  GVW is even playing with died-in-the-wool, motherhood and apple pie issues like eliminating (very small/unusable) allocations.  Allocations?  Wow.  Yes, allocations run with the land, yes they are a legal entity and yes GVW will get legal advice on eliminating an allocation or two.  Tread carefully folks.  Despite the nearly impossible ability of these historical (one or two) subdivided too-small properties to become farms and actually use their allocation, an allocation is still an allocation.  A legal right to water that runs with the land.  It cannot be sold, transferred to another property if the owner moves, and a GVW bylaw provision allows for tax relief only up to .4ha annually if the property is not irrigated.  GVW is getting legal advice on whether eliminating those properties' allocations and perhaps granting them a credit, as a retroactive Development Cost Charge (DCC), is the way to go.

It occurs to me that allocations have always been--and today remain--water rights, but the constant reference by GVW to farming allocations is onerous.  Many allocations exist--including my Highlands Golf property--that are not farmed, yet the allocation--water right--remains.  Nothing to do with farming the land.  And that had better not change, GVW!

I'm reminded of: "Democracy must be something more than two wolves and one sheep voting on what to have for dinner."   But I digress.

One excellent feature of the proposed revised rate sheets beginning at page 16 through to page 29 at this link is the History and Purpose of the item is clearly presented for GVAC directors' perusal.  Whether it was "inherited from VID (the former Vernon Irrigation District), etc. is interesting indeed, and allows GVAC directors to better understand GVW's purpose in revising specifications and parameters of classifications for all manner of water users.  

...which leads me to the revised rate sheet on page 24 "Private Unmetered Fire Hydrants" issue...blog stories of GVW's gouging and procedural unfairness/inequity are here and here and here and here (just a few of the many blog articles on the topic) as they relate to Highlands Golf's challenge of GVW's outrageous annual fees.  The rate sheet "history" states only "Inherited from VID...in 2013 GVW found 90 new mains and started billing the owners in 2014.  In the 2015 fee bylaw, the fee was dropped to $132 per year for all main sizes".  Details were omitted, provided below.  It was also unreported that Highlands had been paying annual private fire hydrant fees since 2001 until lodging an appeal. 

Another example of what non-verbatim minutes produce:  Not unexpectedly, director Macnabb--in his typical biased style--commented yet again today on the apparently (to him) unfairness that private hydrant owners already receive fire insurance savings from the hydrant proximity to their homes...and presumably that we aren't to expect more concessions (the annual rate was dropped to $132 from $560).  A thinking person would realize that any homeowner adjacent to a public fire hydrant would also receive fire insurance savings!  Director Macnabb (and GVW) conveniently omitted any reference that GVW had not been charging the majority of private fire hydrant owners any fee at all for years and years.  Director Spiers had, last year, gone to bat for Highlands' appeal by stating a response to McTaggart's comment that there would be a $62,395.00 loss in GVW revenue if the appeal succeeded.  The Spiers comment was "yes, that would be true if GVW were actually billing the 84 customers who owned 150mm hydrants...when in fact you billed only 8 + 4 in that category."  Mr. Spiers continued:  "Of the 120 customers with all sizes of unmetered hydrants, only 17 were billed in total, so the revenue is $24,000.00, not $62,395.00!" 

Director Spiers today asked whether credit(s) were forthcoming to those customers who had not been charged previously but had in 2014 received large private fire hydrant invoices (before the rate was changed after Highlands' successful appeal).  In a nutshell, GVW's response was that "legal opinion was obtained and that "regional districts cannot issue a refund; however, municipalities are not bound by the same legislation...".  A big tip of the Highlands hat to Director Spiers (Vernon councillor) to thank him for staying with the topic and seeing it through to its "procedurally fair and equitable" (my appeal basis) conclusion.  Thank you, director Spiers!

The next topic was community garden water rates.
A blog backgrounder is provided here and here, and indicate that the community garden at OUC had been audited by GVW.  They now have reduced water usage by approx. 50 per cent (still use more water than Highlands Golf's 15 acre property that irrigates during the same period annually).  A 2-acre community garden!  Wow.

The last three pages (of the 87 page agenda) provide unadopted minutes for the inaugural SAC meeting.  From a blog perspective--and presumably also from CCMWP's perspective--there are so many "issues" concerning the committee's "review" and terms of reference that another blog story is warranted.
But not today.

 


Hopefully, GVAC Chair Cunningham will realize that a "happier medium" needs to be achieved between non-verbatim and verbatim minutes of meetings.  Because the present system of recording what really transpires at meetings is untenable.
Unless good ideas should continue to die.
Unless obfuscation is the goal.

"Giving money and power to bureaucracy is like giving whiskey and car keys to teenage boys," offers Kia.

Supervision and analysis remain paramount.
And, reading between the lines is often required, too.


Friday, September 4, 2015

Bureaucrats Turned Capitalists, and Back Again


A blunt description of Greater Vernon Water.

Gougers.
Creative accountants.

Was there even a water emergency this year?
Stage 1 water restrictions--threatened during late August to be extended to Stage 2--wasn't really necessary, was it?


The GVW water bureaucrats seemed almost surprised when revenues fell as people started conserving water.
The GVW water capitalists seem determine to fund the Master Water Plan despite the failure of the $70 million borrowing referendum for their six projects last winter.


"The big question is...is the reduced consumption request (by imposing Stage 1 restrictions) justified?
 Is the reduction in revenues resulting from the reduction in usage justified?
Will the increased rates to recover shortfalls of revenue be justified?"  G.Kiss
 

First, today's Morning Star story, entitled "Utility Looks at Revenue", by Rolke:

"It may appear that Greater Vernon is awash with cash but revenue flow could slow to a trickle yet.
Greater Vernon Advisory Committee directors were told Thursday that utility revenue is up $1.2 million for the first six months of 2015.

'Summer started earlier this year and revenue spiked,' said Stephen Banmen, general manager of finance.  'There have been concerns about water restrictions and the impact on water revenue and what we're looking at is revenue is ahead of the game.'

Compared to 2014, consumption fee revenue for the first two quarters has gone from $2.8 to $3.6 million, or an additional $800,000.

Base fee and other revenue are ahead of 2015 budget projections by $400,000.

Higher revenue had been anticipated in the 2015 budget because of a two per cent rate increase.  The current trend isn't expected to continue.

'Overall consumption is down for the third quarter so we won't meet budget projections in the third quarter,' said Banmen, adding that those figures aren't compiled yet.

A report states that if fourth quarter consumption is the same as 2014, third quarter consumption would have to drop 22 per cent from the same period in 2014 to not meet revenue targets.

Director Gyula Kiss raised some questions Thursday.  'Are we charging too much?; said Kiss, who also wanted to know if a 2016 rate hike can be avoided.

No commitment was made either way.  'We will have that discussion,' said chairperson Juliette Cunningham of upcoming budget talks."    Morning Star Sept.4/15.


As Director Kiss asked some time ago:  "The big question is...is the reduced consumption request (by imposing Stage 1 restrictions) justified?  Is the reduction in revenues resulting from the reduction in usage justified?  Will the increased rates to recover shortfalls of revenue be justified?"

Gyula Kiss continues to make lucid observations:

First, the 40 year water demand chart:


The next chart shows the actual consumption table put together from the water utility's Annual Reports spanning 2011 to 2014.  Note the difference in predicted and actual consumption.  Did we build too large a system?  Did we pay too much for it?  If we were expecting to use 9,670 in 2011, should we not use that figure as the base for the 10 per cent reduction in water consumption?  After all, the utility was predicting that volume!  If the planners expected to have the consumption based on those figures, is it not possible that our water rates are influenced by the reduced consumption?  If we cannot provide the necessary volumes today (at 6,000 ML per year), what can be expect in the year 2062?

"...to be in the Stage 1 zone in September, we would have to
 use over 7,000 MLs from the Duteau reservoir.
 Is this likely to happen?"  G.Kiss.

     




Below is the July 15th volume graph, with some explanation.  During the first nearly three months of hot weather, GVW customers used about 4,000 MLs of water from Duteau.  On September 14th, GVW advises that the irrigation system will begin its Fall shutdown.

In order to be in the Stage 1 zone in September, we would have to use over 7,000 MLs from the Duteau reservoir.  Is this likely to happen?




Repeating the big question from Director Kiss:

"Is the reduced consumption request justified?"
"Is the reduction in revenues resulting from the reduction in usage justified?"
"Will the increased rates to recover shortfalls of revenue be justified?"




Oh...almost forgot the photo of yet another weather system inundating the Aberdeen Plateau area, this time on Tuesday, September 1st, 2015:




And repeating a simple chart, courtesy of Citizens for Changes to the Master Water Plan, showing what bureaucrats-turned-capitalists have created.





"The road's probably still too muddy to update the August 15th reservoir level to reflect actual storage versus estimated numbers," offers Kia.

No doubt.