Months of planning are now coming to fruition.











A two hundred metre length of tech cable was trenched, inverters and associated components were installed, and wiring is nearing completion. Concrete core tested out at 31.8 mpa (over 90 per cent) within 7 days; a second core test is scheduled for Monday and will hopefully achieve 35 mpa. Update June 8th = 36.5 mpa. Perfect!

"The thing reduces me to the size of a squirrel," laments Kia from the shade.